| ^Construction Activity^Schedule Consideration^ | ^Construction Activity^Schedule Consideration^ | ||
| |**Construction access** - Construction entrance, construction routes, equipment parking areas|First land disturbing activity - stabilize bare areas immediately with gravel and temporary vegetation as construction takes place.| | |**Construction access** - Construction entrance, construction routes, equipment parking areas|First land disturbing activity - stabilize bare areas immediately with gravel and temporary vegetation as construction takes place.| | ||
| - | |''' | + | |**Sediment traps and barriers** - Basins, traps, silt fences, and outlet protection|Install principal basins after construction site is accessed. |
| - | |''' | + | |**Runoff control** - Diversions, dikes, and outlet protection|Install key practices after principal sediment traps and before land grading. |
| - | |''' | + | |**Runoff conveyance system** - Stabilize stream banks, storm drains, channels, inlet and outlet protection, channels, and slope drains|Where necessary, stabilize stream banks as early as possible. |
| - | |''' | + | |**Land clearing and grading** - Site preparation, |
| - | |''' | + | |**Surface stabilization** - [[Seeding]], |
| - | |''' | + | |**Building construction** - Buildings, utilities, and paving|Install necessary practices before work takes place.| |
| - | |''' | + | |**Infiltration Practices** - [[bioretention |
| - | |''' | + | |**Landscaping and final stabilization** - Topsoiling, trees and shrubs, [[seeding]], |
| - | :!:**Maintenance activities are required throughout the construction process. Inspections shall be performed at least weekly and after all storm events. | + | :!: Maintenance activities are required throughout the construction process. Inspections shall be performed at least weekly and after all storm events. |