Line 32: Line 32:
 |**Surface stabilization** - [[Seeding]], [[native plants]], [[mulching]], [[sod|sodding]], and riprap|Apply temporary or permanent stabilization measures immediately on all disturbed areas where work is delayed or complete.| |**Surface stabilization** - [[Seeding]], [[native plants]], [[mulching]], [[sod|sodding]], and riprap|Apply temporary or permanent stabilization measures immediately on all disturbed areas where work is delayed or complete.|
 |**Building construction** - Buildings, utilities, and paving|Install necessary practices before work takes place.| |**Building construction** - Buildings, utilities, and paving|Install necessary practices before work takes place.|
-|**Infiltration Practices** - [[bioretention basin]], [[infiltration basin]], [[rain garden]], [[infiltration trench]]|Must be installed during final stabilization or when runoff can be diverted and prevented from disturbing the site to avoid being filled with sediment during construction.|+|**Infiltration Practices** - [[bioretention device]], [[infiltration basin]], [[rain garden]], [[infiltration trench]]|Must be installed during final stabilization or when runoff can be diverted and prevented from disturbing the site to avoid being filled with sediment during construction.|
 |**Landscaping and final stabilization** - Topsoiling, trees and shrubs, [[seeding]], [[mulching]], [[sod|sodding]], riprap|Last construction phase - Stabilize all open areas, including borrow and spoil areas.  Remove and stabilize all temporary practices.| |**Landscaping and final stabilization** - Topsoiling, trees and shrubs, [[seeding]], [[mulching]], [[sod|sodding]], riprap|Last construction phase - Stabilize all open areas, including borrow and spoil areas.  Remove and stabilize all temporary practices.|
  
-:!:**Maintenance activities are required throughout the construction process. Inspections shall be performed at least weekly and after all storm events.  All necessary repairs shall be made immediately.**+:!: Maintenance activities are required throughout the construction process. Inspections shall be performed at least weekly and after all storm events.  All necessary repairs shall be made immediately.
  
 =====Construction and Maintenance===== =====Construction and Maintenance=====