User Tools

Site Tools


construction_scheduling

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
construction_scheduling [2022/05/11 11:33] adminconstruction_scheduling [2022/05/11 11:33] (current) admin
Line 35: Line 35:
 |**Landscaping and final stabilization** - Topsoiling, trees and shrubs, [[seeding]], [[mulching]], [[sod|sodding]], riprap|Last construction phase - Stabilize all open areas, including borrow and spoil areas.  Remove and stabilize all temporary practices.| |**Landscaping and final stabilization** - Topsoiling, trees and shrubs, [[seeding]], [[mulching]], [[sod|sodding]], riprap|Last construction phase - Stabilize all open areas, including borrow and spoil areas.  Remove and stabilize all temporary practices.|
  
-:!:**Maintenance activities are required throughout the construction process. Inspections shall be performed at least weekly and after all storm events.  All necessary repairs shall be made immediately.**+:!: Maintenance activities are required throughout the construction process. Inspections shall be performed at least weekly and after all storm events.  All necessary repairs shall be made immediately.
  
 =====Construction and Maintenance===== =====Construction and Maintenance=====
construction_scheduling.1652283199.txt.gz · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki