construction_scheduling
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| construction_scheduling [2022/05/11 11:33] – admin | construction_scheduling [2022/05/11 11:33] (current) – admin | ||
|---|---|---|---|
| Line 35: | Line 35: | ||
| |**Landscaping and final stabilization** - Topsoiling, trees and shrubs, [[seeding]], | |**Landscaping and final stabilization** - Topsoiling, trees and shrubs, [[seeding]], | ||
| - | : | + | :!: Maintenance activities are required throughout the construction process. Inspections shall be performed at least weekly and after all storm events. |
| =====Construction and Maintenance===== | =====Construction and Maintenance===== | ||
construction_scheduling.1652283225.txt.gz · Last modified: by admin
