| Construction of stormwater practices that rely on infiltration to properly function (e.g. bioretention, | Construction of stormwater practices that rely on infiltration to properly function (e.g. bioretention, | ||
| - | =====Construct infiltration practices only after the site has been vegetated.===== | + | **Construct infiltration practices only after the site has been vegetated.** |
| *Multiple mobilizations may be necessary. | *Multiple mobilizations may be necessary. | ||
| - | *If a practice needs to be constructed before vegetation establishment, | + | *If a practice needs to be constructed before vegetation establishment, |
| - | construction runoff from entering the practice, ideally through temporary | + | *If a sediment trap must be placed in the location of the practice, only excavate as deep as necessary and maintain two (2) feet of cover over final excavation depth. |
| - | diversion. | + | |
| - | *If a sediment trap must be placed in the location of the practice, only excavate | + | |
| - | as deep as necessary and maintain two (2) feet of cover over final excavation | + | |
| - | depth. | + | |
| - | =====Prevent and alleviate compaction of native soils and backfilled material.===== | + | **Prevent and alleviate compaction of native soils and backfilled material.** |
| *Limit construction traffic in excavation and use only tracked vehicles. | *Limit construction traffic in excavation and use only tracked vehicles. | ||
| - | *Excavate to final depth during dry weather and have all materials on site to | + | *Excavate to final depth during dry weather and have all materials on site to complete construction prior to forecasted rain. |
| - | complete construction prior to forecasted rain. | + | *Scarify native subgrade with ripper or bucket teeth on the last pass of excavation. |
| - | *Scarify native subgrade with ripper or bucket teeth on the last pass of | + | |
| - | excavation. | + | |
| - | =====Work with project engineer to certify materials and construction of practice.===== | + | **Work with project engineer to certify materials and construction of practice.** |
| *Verify native soil meets design specification and take representative sample. | *Verify native soil meets design specification and take representative sample. | ||
| *Provide load tickets for all materials used. | *Provide load tickets for all materials used. | ||