User Tools

Site Tools


polymer_and_other_additives

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
polymer_and_other_additives [2022/05/13 10:04] – created adminpolymer_and_other_additives [2023/11/21 15:31] (current) admin
Line 40: Line 40:
  
 =====Maintenance===== =====Maintenance=====
-*Applied areas shall be inspected weekly and after each rainfall event for evidence of rill erosion, requiring reapplication +  *Applied areas shall be inspected weekly and after each rainfall event for evidence of rill erosion, requiring reapplication 
-*Reapplication per manufactures’ specifications +  *Reapplication per manufactures’ specifications 
-*Reapplication after any site disturbance+  *Reapplication after any site disturbance
  
 =====Method to Determine Practice Efficiency===== =====Method to Determine Practice Efficiency=====
Line 48: Line 48:
  
 ==References== ==References==
-  *[[https://dnr.wi.gov/topic/stormWater/documents/1050LandApplAdditives.pdf|Wisconsin DNR "Land Application of Additives for Erosion Control" Conservation Practice Standard 1050]]+  *[[https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/1050LandApplAdditives.pdf|Wisconsin DNR Land Application of Additives for Erosion Control Technical Standard 1050]]
polymer_and_other_additives.1652450660.txt.gz · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki