| ====== Prescriptive Compliance ====== | ====== Prescriptive Compliance ====== | ||
| - | Soil loss generated from gentle and moderate slopes subject to sheet and rill erosion can be determined using the USLE model. Steep slopes and areas of concentrated flows, such as swales, | + | Soil loss generated from gentle and moderate slopes subject to sheet and rill erosion can be determined using the [[Soil Loss and Sediment Discharge|Universal Soil Loss Equation (USLE)]] model. Steep slopes and areas of concentrated flows cannot be modeled using the USLE methodology, |
| - | Prescriptive compliance | + | Prescriptive compliance |
| Specific areas where prescriptive compliance should be followed are: | Specific areas where prescriptive compliance should be followed are: | ||
| Line 18: | Line 18: | ||
| Once areas identified as needing prescriptive compliance are identified and clearly defined in the plan, appropriate measures and specifications need to be designed, as detailed below. | Once areas identified as needing prescriptive compliance are identified and clearly defined in the plan, appropriate measures and specifications need to be designed, as detailed below. | ||
| - | ====Bare Soil==== | + | ====Practices==== |
| - | * Areas that do not drain to sediment traps must limit the duration of soil exposure to no more than 30 days. | + | * Design and implement approved stabilization practices, typically |
| - | * Areas that Drain to sediment traps must limit the duration of soil exposure to no more than 90 days. | + | * Design |
| - | + | * Specify | |
| - | ====Channel & Slope Management==== | + | |
| - | * Design and implement approved stabilization practices, typically [[Erosion Matting]]. | + | |
| - | * Provide | + | |
| - | * Provide | + | |
| ====Stabilization==== | ====Stabilization==== | ||
| - | * Areas left inactive for more than 14 days must be stabilized | + | * Areas that do not drain to a sediment trap must be stabilized within 30 days. |
| - | * Areas at final grade must be stabilized immediately. | + | * Areas that drain to an appropriately sized [[sediment trap]] |
| + | * Areas left inactive for more than 14 days and those at final grade must be stabilized immediately. | ||
| + | |||
| + | ===References=== | ||
| + | *{{ : | ||