 ====Practices==== ====Practices====
-  * Design and implement approved stabilization practices, typically [[Erosion Matting]]. +  * Design and implement approved stabilization practices, typically [[seeding]] with [[Erosion Matting]]. 
-  * Provide stable diversion of off-site runoff around slopes. +  * Design stable diversion of off-site runoff around slopes. 
-  * Provide [[silt sock|slope interruption devices]] on slopes.+  * Specify [[silt sock|slope interruption devices]] on slopes.
  
 ====Stabilization==== ====Stabilization====
-  * Areas that do not drain to sediment traps must be stabilized within 30 days.+  * Areas that do not drain to sediment trap must be stabilized within 30 days.
   * Areas that drain to an appropriately sized [[sediment trap]] must be stabilized with 90 days.   * Areas that drain to an appropriately sized [[sediment trap]] must be stabilized with 90 days.
   * Areas left inactive for more than 14 days and those at final grade must be stabilized immediately.   * Areas left inactive for more than 14 days and those at final grade must be stabilized immediately.
 +
 +===References===
 +  *{{ :usle_guidance.pdf |Wisconsin DNR Construction Site Soil Loss Guidance}}