User Tools

Site Tools


prescriptive_compliance

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
prescriptive_compliance [2025/04/24 14:18] adminprescriptive_compliance [2025/04/24 14:39] (current) admin
Line 19: Line 19:
  
 ====Practices==== ====Practices====
-  * Design and implement approved stabilization practices, typically [[Erosion Matting]]. +  * Design and implement approved stabilization practices, typically [[seeding]] with [[Erosion Matting]]. 
-  * Provide stable diversion of off-site runoff around slopes. +  * Design stable diversion of off-site runoff around slopes. 
-  * Provide [[silt sock|slope interruption devices]] on slopes.+  * Specify [[silt sock|slope interruption devices]] on slopes.
  
 ====Stabilization==== ====Stabilization====
Line 27: Line 27:
   * Areas that drain to an appropriately sized [[sediment trap]] must be stabilized with 90 days.   * Areas that drain to an appropriately sized [[sediment trap]] must be stabilized with 90 days.
   * Areas left inactive for more than 14 days and those at final grade must be stabilized immediately.   * Areas left inactive for more than 14 days and those at final grade must be stabilized immediately.
 +
 +===References===
 +  *{{ :usle_guidance.pdf |Wisconsin DNR Construction Site Soil Loss Guidance}}
prescriptive_compliance.1745518689.txt.gz · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki