temporary_diversion [2022/05/11 10:52] – created admintemporary_diversion [2023/11/21 15:40] (current) admin
Line 35: Line 35:
  
 =====Construction and Maintenance===== =====Construction and Maintenance=====
-*Diversions should be mulched immediately after grading to prevent erosion of the structure +  *Diversions should be mulched immediately after grading to prevent erosion of the structure 
-*Temporary diversions should be inspected for damage after each rainfall +  *Temporary diversions should be inspected for damage after each rainfall 
-*Routine inspections should be performed weekly - any damage should be repaired immediately+  *Routine inspections should be performed weekly - any damage should be repaired immediately
  
 =====Method to Determine Practice Efficiency===== =====Method to Determine Practice Efficiency=====
Line 43: Line 43:
  
 ==References== ==References==
-  *[[https://dnr.wi.gov/topic/stormWater/documents/1066ConstructionSiteDiversion.pdf|Wisconsin DNR Construction Site Diversion Conservation Practice Standard 1066]]+  *[[https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/1066ConstructionSiteDiversion.pdf|DNR Construction Site Diversion Technical Standard 1066]]