temporary_diversion
Differences
This shows you the differences between two versions of the page.
| Next revision | Previous revision | ||
| temporary_diversion [2022/05/11 10:52] – created admin | temporary_diversion [2023/11/21 15:40] (current) – admin | ||
|---|---|---|---|
| Line 35: | Line 35: | ||
| =====Construction and Maintenance===== | =====Construction and Maintenance===== | ||
| - | *Diversions should be mulched immediately after grading to prevent erosion of the structure | + | |
| - | *Temporary diversions should be inspected for damage after each rainfall | + | *Temporary diversions should be inspected for damage after each rainfall |
| - | *Routine inspections should be performed weekly - any damage should be repaired immediately | + | *Routine inspections should be performed weekly - any damage should be repaired immediately |
| =====Method to Determine Practice Efficiency===== | =====Method to Determine Practice Efficiency===== | ||
| Line 43: | Line 43: | ||
| ==References== | ==References== | ||
| - | *[[https:// | + | *[[https:// |
temporary_diversion.1652280737.txt.gz · Last modified: by admin
