erosion_control
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
erosion_control [2022/05/19 12:13] – admin | erosion_control [2022/05/19 12:14] (current) – admin | ||
---|---|---|---|
Line 14: | Line 14: | ||
To minimize erosion from construction sites and protect the county’s lakes and streams from sediment pollution, it's required that plans for all construction sites include practices that meet the standards in the table below. | To minimize erosion from construction sites and protect the county’s lakes and streams from sediment pollution, it's required that plans for all construction sites include practices that meet the standards in the table below. | ||
- | ^Standard | + | ^Standard^Performance Requirement^Purpose^Applicability^ |
|Sheet and Rill Erosion|Limit cumulative sediment deposition to 5 tons/ | |Sheet and Rill Erosion|Limit cumulative sediment deposition to 5 tons/ | ||
|Gully and Streambank Erosion|Prevent gully and streambank erosion|Minimize soil loss and prevent water quality and aquatic habitat degradation|All sites requiring an erosion control plan| | |Gully and Streambank Erosion|Prevent gully and streambank erosion|Minimize soil loss and prevent water quality and aquatic habitat degradation|All sites requiring an erosion control plan| | ||
Line 45: | Line 45: | ||
|[[Silt Fence]] and [[Silt Sock]]|Sheet and Rill Erosion|Widely Applicable|High|Sediment transport; High rates of failure if not properly installed and maintained; Disposal|Longevity, | |[[Silt Fence]] and [[Silt Sock]]|Sheet and Rill Erosion|Widely Applicable|High|Sediment transport; High rates of failure if not properly installed and maintained; Disposal|Longevity, | ||
|[[Slope Drain]]|Sheet and Rill Erosion; Gully Erosion|Applicable on sites that are vulnerable to convey runoff downslope|Moderate|Possible erosion around inlet & outlet|Pipe size| | |[[Slope Drain]]|Sheet and Rill Erosion; Gully Erosion|Applicable on sites that are vulnerable to convey runoff downslope|Moderate|Possible erosion around inlet & outlet|Pipe size| | ||
- | |[[Stone Check Dam]]|Sheet and Rill Erosion; Gully Erosion|Applicable to vegetated ditches and swales, Drainage areas <2 acres| Low to Moderate|Does not remove smaller suspended | + | |[[Stone Check Dam]]|Sheet and Rill Erosion; Gully Erosion|Applicable to vegetated ditches and swales, Drainage areas <2 acres| Low to Moderate|Does not remove smaller suspended |
|[[Stone Tracking Pad]]|Sheet and Rill Erosion|Widely Applicable|Low to High|None|Cost effective; Must use >3" clear stone| | |[[Stone Tracking Pad]]|Sheet and Rill Erosion|Widely Applicable|Low to High|None|Cost effective; Must use >3" clear stone| | ||
|[[Stone Weeper]]|Sheet and Rill Erosion; Gully Erosion|Applicable to vegetated ditches and swales, Drainage areas <2 acres|Low to Moderate|Does not remove smaller suspended particles| | | |[[Stone Weeper]]|Sheet and Rill Erosion; Gully Erosion|Applicable to vegetated ditches and swales, Drainage areas <2 acres|Low to Moderate|Does not remove smaller suspended particles| | |
erosion_control.1652976808.txt.gz · Last modified: by admin