User Tools

Site Tools


erosion_control

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
erosion_control [2022/05/19 12:13] adminerosion_control [2022/05/19 12:14] (current) admin
Line 14: Line 14:
 To minimize erosion from construction sites and protect the county’s lakes and streams from sediment pollution, it's required that plans for all construction sites include practices that meet the standards in the table below. To minimize erosion from construction sites and protect the county’s lakes and streams from sediment pollution, it's required that plans for all construction sites include practices that meet the standards in the table below.
  
-^Standard Name^Performance Requirement^Purpose^Applicability^+^Standard^Performance Requirement^Purpose^Applicability^
 |Sheet and Rill Erosion|Limit cumulative sediment deposition to 5 tons/acre/year|Minimize soil loss and prevent water quality and aquatic habitat degradation|All sites requiring an erosion control plan| |Sheet and Rill Erosion|Limit cumulative sediment deposition to 5 tons/acre/year|Minimize soil loss and prevent water quality and aquatic habitat degradation|All sites requiring an erosion control plan|
 |Gully and Streambank Erosion|Prevent gully and streambank erosion|Minimize soil loss and prevent water quality and aquatic habitat degradation|All sites requiring an erosion control plan| |Gully and Streambank Erosion|Prevent gully and streambank erosion|Minimize soil loss and prevent water quality and aquatic habitat degradation|All sites requiring an erosion control plan|
Line 45: Line 45:
 |[[Silt Fence]] and [[Silt Sock]]|Sheet and Rill Erosion|Widely Applicable|High|Sediment transport; High rates of failure if not properly installed and maintained; Disposal|Longevity, proper installation| |[[Silt Fence]] and [[Silt Sock]]|Sheet and Rill Erosion|Widely Applicable|High|Sediment transport; High rates of failure if not properly installed and maintained; Disposal|Longevity, proper installation|
 |[[Slope Drain]]|Sheet and Rill Erosion; Gully Erosion|Applicable on sites that are vulnerable to convey runoff downslope|Moderate|Possible erosion around inlet & outlet|Pipe size| |[[Slope Drain]]|Sheet and Rill Erosion; Gully Erosion|Applicable on sites that are vulnerable to convey runoff downslope|Moderate|Possible erosion around inlet & outlet|Pipe size|
-|[[Stone Check Dam]]|Sheet and Rill Erosion; Gully Erosion|Applicable to vegetated ditches and swales, Drainage areas <2 acres| Low to Moderate|Does not remove smaller suspended solids||+|[[Stone Check Dam]]|Sheet and Rill Erosion; Gully Erosion|Applicable to vegetated ditches and swales, Drainage areas <2 acres| Low to Moderate|Does not remove smaller suspended particles| |
 |[[Stone Tracking Pad]]|Sheet and Rill Erosion|Widely Applicable|Low to High|None|Cost effective; Must use >3" clear stone| |[[Stone Tracking Pad]]|Sheet and Rill Erosion|Widely Applicable|Low to High|None|Cost effective; Must use >3" clear stone|
 |[[Stone Weeper]]|Sheet and Rill Erosion; Gully Erosion|Applicable to vegetated ditches and swales, Drainage areas <2 acres|Low to Moderate|Does not remove smaller suspended particles| | |[[Stone Weeper]]|Sheet and Rill Erosion; Gully Erosion|Applicable to vegetated ditches and swales, Drainage areas <2 acres|Low to Moderate|Does not remove smaller suspended particles| |
erosion_control.1652976808.txt.gz · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki