User Tools

Site Tools


erosion_control_notes

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
erosion_control_notes [2022/08/02 12:28] adminerosion_control_notes [2022/12/09 17:15] (current) jess_starks
Line 15: Line 15:
   - Temporarily stabilize disturbed areas that will remain inactive for 14 days.   - Temporarily stabilize disturbed areas that will remain inactive for 14 days.
   - Permanently stabilize any portion of the site within 7 days of reaching final grade.   - Permanently stabilize any portion of the site within 7 days of reaching final grade.
 +  - Install and maintain a concrete washout. Chute washwater may not be dumped on the ground.
   - De-watering shall conform to DNR Technical Standard 1061 and may not increase erosion.   - De-watering shall conform to DNR Technical Standard 1061 and may not increase erosion.
   - Remove accumulated sediment from ditch checks and stone weepers when it reaches 1/2 of the device height.   - Remove accumulated sediment from ditch checks and stone weepers when it reaches 1/2 of the device height.
erosion_control_notes.1659457705.txt.gz · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki