Line 2: | Line 2: | ||
This page is intended to provide guidance on infiltration design, modeling and construction, | This page is intended to provide guidance on infiltration design, modeling and construction, | ||
+ | |||
+ | :!: The current version of WinSLAMM (10.5.0) overestimates evapotranspiration (ET) volume. Until a fix is implemented, | ||
=====Site Consideration===== | =====Site Consideration===== | ||
Line 7: | Line 9: | ||
*Removal of up to 5 feet of undesirable material in order to reach appropriate infiltrating soils is expected before attempting to claim an [[infiltration exemptions|exemption]]. | *Removal of up to 5 feet of undesirable material in order to reach appropriate infiltrating soils is expected before attempting to claim an [[infiltration exemptions|exemption]]. | ||
- | *Design infiltration rates should be determined using test pits and soil textural classifications from Table 2 of the DNR's Technical Standard [[https:// | + | *Design infiltration rates should be determined using test pits and soil textural classifications from Table 2 of the DNR's Technical Standard [[https:// |
- | *Topographical depressions | + | *Topographical depressions exceeding 1 foot in depth and 20,000 square feet in area should be modeled as ponds in the predevelopment model. Smaller depressions should be modeled using the “ponded area” routines in TR55 and similar models. |
*[[as_built_certification|As-built certification]] must be completed by a Professional Engineer stating that the stormwater facility is functional and consistent with the approved design. | *[[as_built_certification|As-built certification]] must be completed by a Professional Engineer stating that the stormwater facility is functional and consistent with the approved design. | ||
Line 37: | Line 39: | ||
- | *[[https:// | + | *[[https:// |
- | *[[https:// | + | *[[https:// |
*[[Owners Guide to Infiltration|Owner' | *[[Owners Guide to Infiltration|Owner' |