infiltration_practices
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| infiltration_practices [2022/05/24 16:47] – admin | infiltration_practices [2022/06/29 16:31] (current) – admin | ||
|---|---|---|---|
| Line 9: | Line 9: | ||
| ^ ^[[Rain Garden]]^[[Bioretention Device]]^[[Infiltration Basin]]^ | ^ ^[[Rain Garden]]^[[Bioretention Device]]^[[Infiltration Basin]]^ | ||
| - | |**Watershed Size**|≤3, | + | |**Watershed Size**|≤3, |
| - | |**Pretreatment**|Not required|Not required|60% residential, | + | |**TSS Pretreatment**|Not required|Not required|60% residential, |
| + | |**Max Ponding Depth**|8 inches|12 inches (6-9 inches optimal)|24 inches| | ||
| |**Drawdown Time**|< | |**Drawdown Time**|< | ||
| |**Surface Layer**|Mulch|Mulch or class II matting|Not required| | |**Surface Layer**|Mulch|Mulch or class II matting|Not required| | ||
| Line 17: | Line 18: | ||
| |**Underdrain**|Not required|Required if native infiltration rate <3.6 in/hr|Not required| | |**Underdrain**|Not required|Required if native infiltration rate <3.6 in/hr|Not required| | ||
| |**Vegetation**|Native plant plugs or seed recommended, | |**Vegetation**|Native plant plugs or seed recommended, | ||
| - | |**Applicable Standards**|Infiltration\Thermal\Green Infrastructure|Infiltration\Sediment\Oil & Grease\Thermal\Green Infrastructure|Infiltration\Thermal\Green Infrastructure| | + | |**Applicable Standards**|Infiltration, Green Infrastructure, Thermal|Infiltration, Sediment, Oil & Grease, Green Infrastructure, Thermal|Infiltration, Green Infrastructure, Thermal| |
infiltration_practices.1653425236.txt.gz · Last modified: by admin
