User Tools

Site Tools


mulching

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
mulching [2022/05/02 17:16] – created adminmulching [2025/01/30 10:06] (current) admin
Line 56: Line 56:
   *All grading activities shall be completed and the area seeded before mulch is applied (except in hydroseeding applications)   *All grading activities shall be completed and the area seeded before mulch is applied (except in hydroseeding applications)
   *Tackifiers shall not be applied in windy conditions   *Tackifiers shall not be applied in windy conditions
-  *Mulch, when applied correctly, will have a uniform thickness of 5-7 pieces 
  
 =====Maintenance===== =====Maintenance=====
Line 65: Line 64:
  
 ====References==== ====References====
-  *[[https://dnr.wi.gov/topic/stormWater/documents/1058Mulching.pdf|Wisconsin DNR Mulching for Construction Sites Conservation Practice Standard 1058]]+  *[[https://dnr.wisconsin.gov/sites/default/files/topic/Stormwater/1058Mulching.pdf|Wisconsin DNR Mulching for Construction Sites Technical Standard 1058]]
   *[[https://efotg.sc.egov.usda.gov/api/CPSFile/3235/484_WI_CPS_Mulching_2016|NRCS   *[[https://efotg.sc.egov.usda.gov/api/CPSFile/3235/484_WI_CPS_Mulching_2016|NRCS
 Conservation Practice Standard 484 - Mulching]] Conservation Practice Standard 484 - Mulching]]
mulching.1651526166.txt.gz · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki