User Tools

Site Tools


permit_information

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
permit_information [2022/05/16 10:08] – created adminpermit_information [2025/01/16 10:53] (current) – [Contact Us] megan_duffy
Line 1: Line 1:
 ====== Permit Information ====== ====== Permit Information ======
  
-This page outlines the permits needed for many land disturbing activities and development. Check with Water Resource Engineering Division (WRE) staff to determine if your project needs a permit before you begin.+This page outlines the permits needed for many land disturbing activities and development as required under Dane County Chapters 11 and 14. Check with Water Resource Engineering Division (WRE) staff to determine if your project needs a permit before you begin.
  
-===== Erosion Control Permits =====+===== Erosion Control (EC) Permit =====
  
 This permit is required to limit soil erosion when a project involves any of the following activities: This permit is required to limit soil erosion when a project involves any of the following activities:
Line 14: Line 14:
   * Other activities that pose a high erosion or water pollution risk   * Other activities that pose a high erosion or water pollution risk
  
-===== Shoreland Erosion Control Permits =====+===== Shoreland Erosion Control (SE) Permit =====
  
-This permit is required for **any** amount of land disturbance in the shoreland zone. The shoreland zone includes all lands:+This permit is required for **any** amount of land disturbance in the primary shoreland zone, which includes all lands:
  
-  * Within 1000 feet of a navigable lake, pond, or flowage  
   * Within 300 feet of navigable rivers and streams    * Within 300 feet of navigable rivers and streams 
   * Within 75 feet of wetlands    * Within 75 feet of wetlands 
-  * Within the 100‐year floodplain+  * Within the 100‐year floodplain 
 + 
 +This permit is required for 4,000 square feet of disturbance (including single family homes) in the secondary shoreland zone, which includes all lands: 
 + 
 +  * Within 300 to 1000 feet of a navigable lake, pond, or flowage
  
 :!: Check with Dane County Zoning first to see whether a Shoreland Zoning or Mitigation Permit is required – call (608) 266‐4266. :!: Check with Dane County Zoning first to see whether a Shoreland Zoning or Mitigation Permit is required – call (608) 266‐4266.
  
-===== Stormwater Management Permits ===== +===== Stormwater Management (SM) Permit ===== 
-This permit is required to mitigate the affects of runoff when a project involves any of the following activities:+This permit is required to mitigate the affects of runoff from a [[site]] when a project involves any of the following activities:
  
   * The cumulative creation of 20,000 square feet or more of impervious surface area after August 22, 2001   * The cumulative creation of 20,000 square feet or more of impervious surface area after August 22, 2001
Line 33: Line 36:
   * Land disturbance of more than 4,000 ft<sup>2</sup> of an existing commercial, industrial, institutional, or multifamily use site   * Land disturbance of more than 4,000 ft<sup>2</sup> of an existing commercial, industrial, institutional, or multifamily use site
   * Other activities that pose a high risk of flooding or damage due to runoff   * Other activities that pose a high risk of flooding or damage due to runoff
 +
 +:!: If the permit applicant is not the owner, a notarized {{ :authorization_form.pdf |authorization form}} must be submitted with application.
 +
 +===== Permit Fees =====
 +
 +^Permit^  Ordinance Location  ^  Fee ($)  ^
 +|Simplified Erosion Control|  s. 14.45 meeting criteria in s. 14.50(2)  |  100  |
 +|Erosion Control|  s. 14.45  |  250 base fee + 0.007/ft<sub>2</sub> disturbed area  |
 +|Simplified Shoreland Erosion Control|  s. 11.05(3) meeting criteria in s. 11.05(2)(b) or (d)  |  150  |
 +|Shoreland Erosion Control (PE Waiver)|  Issued under s. 11.05(3) meeting criteria in s. 11.05(2)%%(c)%%  |  250 + 0.007/<sub>2</sub> disturbed area  |
 +|Shoreland Erosion Control|  s. 11.05(3)  |  500 + 0.007/ft<sub>2</sub> of disturbed area  |
 +|Shoreland Mitigation|  s. 11.05(4)  |  500 + 0.016/ft<sub>2</sub> of new impervious area + 0.006/ft<sub>2</sub> of redeveloped impervious area OR 100 for projects meeting s. 11.50(6)(a)  |
 +|Stormwater Management|  s. 14.46  |  500 fee + 0.016/ft<sub>2</sub> of new or redeveloped impervious area  |
  
 ===== Permit Review Process ===== ===== Permit Review Process =====
  
   - If your site is in the Shoreland Zone, please contact Dane County Zoning first at (608) 266‐4266.    - If your site is in the Shoreland Zone, please contact Dane County Zoning first at (608) 266‐4266. 
-  - Submit permit application to the WRE office or digitally to [[WREDiv@countyofdane.com|]] with plan documents uploaded to [[https://countyofdane.sharefile.com/share/upload/red4a6a2fb5840c09|WRE File Transfer Site]]. Permit fees can be delivered to the WRE office or an invoice can be requested.+  - Submit permit application to the WRE office or digitally to [[WREDiv@danecounty.gov|]] with plan documents uploaded to [[https://countyofdanegcc.sharepoint.com/sites/WRE/_layouts/15/onedrive.aspx?p=26&s=aHR0cHM6Ly9jb3VudHlvZmRhbmVnY2Muc2hhcmVwb2ludC5jb20vOmY6L3MvV1JFL0VoLUE3VlRObEJCQWdWRXBJaVpmMTg0QkZDN0xvbS1jQXNvYUNnX2hWT2NMZGc|WRE File Transfer Site]]. Permit fees can be delivered to the WRE office or an invoice can be requested.
   - Upon verifying the application is complete, the plan is queued for review.    - Upon verifying the application is complete, the plan is queued for review. 
   - Water Resource Engineering staff will inform you or your consultant of permit approval or plan deficiencies within 15 working days.    - Water Resource Engineering staff will inform you or your consultant of permit approval or plan deficiencies within 15 working days. 
Line 47: Line 63:
   * The permit card must be posted and a copy of the approved plan must be kept on site for the duration of permit coverage.   * The permit card must be posted and a copy of the approved plan must be kept on site for the duration of permit coverage.
   * Dane County may issue STOP WORK ORDERS and CITATIONS on sites without valid permits.   * Dane County may issue STOP WORK ORDERS and CITATIONS on sites without valid permits.
 +  * Some land disturbing activities may be exempt from county and state erosion control requirements.  Certain state building projects and highway projects are subject to [[https://docs.legis.wisconsin.gov/code/admin_code/trans/401.pdf|Wisconsin Administration Code Chapter Trans 401]].  Refer to Dane County Chapters [[https://danedocs.countyofdane.com/webdocs/pdf/ordinances/ord011.pdf#page=8|11.05(2)]] and [[https://danedocs.countyofdane.com/webdocs/pdf/ordinances/ord014.pdf#page=14|14.47]] for a complete exemption list.
  
 ====== Contact Us ====== ====== Contact Us ======
Line 54: Line 71:
 Madison, WI 53718 Madison, WI 53718
  
-[[https://lwrd.countyofdane.com/about/contact-us|]]+[[https://lwrd.danecounty.gov/about/contact-us|]]
  
  
permit_information.1652710093.txt.gz · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki