User Tools

Site Tools


permit_information

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
permit_information [2022/05/16 10:12] adminpermit_information [2025/01/16 10:53] (current) – [Contact Us] megan_duffy
Line 16: Line 16:
 ===== Shoreland Erosion Control (SE) Permit ===== ===== Shoreland Erosion Control (SE) Permit =====
  
-This permit is required for **any** amount of land disturbance in the shoreland zone. The shoreland zone includes all lands:+This permit is required for **any** amount of land disturbance in the primary shoreland zone, which includes all lands:
  
-  * Within 1000 feet of a navigable lake, pond, or flowage  
   * Within 300 feet of navigable rivers and streams    * Within 300 feet of navigable rivers and streams 
   * Within 75 feet of wetlands    * Within 75 feet of wetlands 
-  * Within the 100‐year floodplain+  * Within the 100‐year floodplain 
 + 
 +This permit is required for 4,000 square feet of disturbance (including single family homes) in the secondary shoreland zone, which includes all lands: 
 + 
 +  * Within 300 to 1000 feet of a navigable lake, pond, or flowage
  
 :!: Check with Dane County Zoning first to see whether a Shoreland Zoning or Mitigation Permit is required – call (608) 266‐4266. :!: Check with Dane County Zoning first to see whether a Shoreland Zoning or Mitigation Permit is required – call (608) 266‐4266.
  
 ===== Stormwater Management (SM) Permit ===== ===== Stormwater Management (SM) Permit =====
-This permit is required to mitigate the affects of runoff when a project involves any of the following activities:+This permit is required to mitigate the affects of runoff from a [[site]] when a project involves any of the following activities:
  
   * The cumulative creation of 20,000 square feet or more of impervious surface area after August 22, 2001   * The cumulative creation of 20,000 square feet or more of impervious surface area after August 22, 2001
Line 33: Line 36:
   * Land disturbance of more than 4,000 ft<sup>2</sup> of an existing commercial, industrial, institutional, or multifamily use site   * Land disturbance of more than 4,000 ft<sup>2</sup> of an existing commercial, industrial, institutional, or multifamily use site
   * Other activities that pose a high risk of flooding or damage due to runoff   * Other activities that pose a high risk of flooding or damage due to runoff
 +
 +:!: If the permit applicant is not the owner, a notarized {{ :authorization_form.pdf |authorization form}} must be submitted with application.
  
 ===== Permit Fees ===== ===== Permit Fees =====
Line 38: Line 43:
 ^Permit^  Ordinance Location  ^  Fee ($)  ^ ^Permit^  Ordinance Location  ^  Fee ($)  ^
 |Simplified Erosion Control|  s. 14.45 meeting criteria in s. 14.50(2)  |  100  | |Simplified Erosion Control|  s. 14.45 meeting criteria in s. 14.50(2)  |  100  |
-|Erosion Control|  s. 14.45  |  200 base fee + 0.006/ft<sub>2</sub> disturbed area  | +|Erosion Control|  s. 14.45  |  250 base fee + 0.007/ft<sub>2</sub> disturbed area  | 
-|Simplified Shoreland Erosion Control|  s. 11.05(3) meeting criteria in s. 11.05(2)(b) or (d)  |  100  | +|Simplified Shoreland Erosion Control|  s. 11.05(3) meeting criteria in s. 11.05(2)(b) or (d)  |  150  | 
-|Shoreland Erosion Control (PE Waiver)|  Issued under s. 11.05(3) meeting criteria in s. 11.05(2)%%(c)%%  |  200 + 0.006/<sub>2</sub> disturbed area  | +|Shoreland Erosion Control (PE Waiver)|  Issued under s. 11.05(3) meeting criteria in s. 11.05(2)%%(c)%%  |  250 + 0.007/<sub>2</sub> disturbed area  | 
-|Shoreland Erosion Control|  s. 11.05(3)  |  400 + 0.006/ft<sub>2</sub> of disturbed area  | +|Shoreland Erosion Control|  s. 11.05(3)  |  500 + 0.007/ft<sub>2</sub> of disturbed area  | 
-|Shoreland Mitigation|  s. 11.05(4)  |  400 + 0.015/ft<sub>2</sub> of new impervious area + 0.006/ft<sub>2</sub> of redeveloped impervious area OR 100 for projects meeting s. 11.50(6)(a) +|Shoreland Mitigation|  s. 11.05(4)  |  500 + 0.016/ft<sub>2</sub> of new impervious area + 0.006/ft<sub>2</sub> of redeveloped impervious area OR 100 for projects meeting s. 11.50(6)(a) 
-|Stormwater Management|  s. 14.46  |  400 fee + 0.015/ft<sub>2</sub> of new or redeveloped impervious area  |+|Stormwater Management|  s. 14.46  |  500 fee + 0.016/ft<sub>2</sub> of new or redeveloped impervious area  |
  
 ===== Permit Review Process ===== ===== Permit Review Process =====
  
   - If your site is in the Shoreland Zone, please contact Dane County Zoning first at (608) 266‐4266.    - If your site is in the Shoreland Zone, please contact Dane County Zoning first at (608) 266‐4266. 
-  - Submit permit application to the WRE office or digitally to [[WREDiv@countyofdane.com|]] with plan documents uploaded to [[https://countyofdane.sharefile.com/share/upload/red4a6a2fb5840c09|WRE File Transfer Site]]. Permit fees can be delivered to the WRE office or an invoice can be requested.+  - Submit permit application to the WRE office or digitally to [[WREDiv@danecounty.gov|]] with plan documents uploaded to [[https://countyofdanegcc.sharepoint.com/sites/WRE/_layouts/15/onedrive.aspx?p=26&s=aHR0cHM6Ly9jb3VudHlvZmRhbmVnY2Muc2hhcmVwb2ludC5jb20vOmY6L3MvV1JFL0VoLUE3VlRObEJCQWdWRXBJaVpmMTg0QkZDN0xvbS1jQXNvYUNnX2hWT2NMZGc|WRE File Transfer Site]]. Permit fees can be delivered to the WRE office or an invoice can be requested.
   - Upon verifying the application is complete, the plan is queued for review.    - Upon verifying the application is complete, the plan is queued for review. 
   - Water Resource Engineering staff will inform you or your consultant of permit approval or plan deficiencies within 15 working days.    - Water Resource Engineering staff will inform you or your consultant of permit approval or plan deficiencies within 15 working days. 
Line 58: Line 63:
   * The permit card must be posted and a copy of the approved plan must be kept on site for the duration of permit coverage.   * The permit card must be posted and a copy of the approved plan must be kept on site for the duration of permit coverage.
   * Dane County may issue STOP WORK ORDERS and CITATIONS on sites without valid permits.   * Dane County may issue STOP WORK ORDERS and CITATIONS on sites without valid permits.
 +  * Some land disturbing activities may be exempt from county and state erosion control requirements.  Certain state building projects and highway projects are subject to [[https://docs.legis.wisconsin.gov/code/admin_code/trans/401.pdf|Wisconsin Administration Code Chapter Trans 401]].  Refer to Dane County Chapters [[https://danedocs.countyofdane.com/webdocs/pdf/ordinances/ord011.pdf#page=8|11.05(2)]] and [[https://danedocs.countyofdane.com/webdocs/pdf/ordinances/ord014.pdf#page=14|14.47]] for a complete exemption list.
  
 ====== Contact Us ====== ====== Contact Us ======
Line 65: Line 71:
 Madison, WI 53718 Madison, WI 53718
  
-[[https://lwrd.countyofdane.com/about/contact-us|]]+[[https://lwrd.danecounty.gov/about/contact-us|]]
  
  
permit_information.1652710348.txt.gz · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki