| Soil loss generated from gentle and moderate slopes subject to sheet and rill erosion can be determined using the [[Soil Loss and Sediment Discharge|Universal Soil Loss Equation (USLE)]] model. Steep slopes and areas of concentrated flows cannot be modeled using the USLE methodology, | Soil loss generated from gentle and moderate slopes subject to sheet and rill erosion can be determined using the [[Soil Loss and Sediment Discharge|Universal Soil Loss Equation (USLE)]] model. Steep slopes and areas of concentrated flows cannot be modeled using the USLE methodology, | ||
| - | Prescriptive compliance | + | Prescriptive compliance |
| Specific areas where prescriptive compliance should be followed are: | Specific areas where prescriptive compliance should be followed are: | ||
| Line 18: | Line 18: | ||
| Once areas identified as needing prescriptive compliance are identified and clearly defined in the plan, appropriate measures and specifications need to be designed, as detailed below. | Once areas identified as needing prescriptive compliance are identified and clearly defined in the plan, appropriate measures and specifications need to be designed, as detailed below. | ||
| - | ====Bare Soil==== | + | ====Practices==== |
| - | * Areas that do not drain to sediment traps must limit the duration of soil exposure to no more than 30 days. | + | * Design and implement approved stabilization practices, typically |
| - | * Areas that drain to sediment traps must limit the duration of soil exposure to no more than 90 days. | + | * Design |
| - | + | * Specify | |
| - | ====Channel & Slope Management==== | + | |
| - | * Design and implement approved stabilization practices, typically [[Erosion Matting]]. | + | |
| - | * Provide | + | |
| - | * Provide | + | |
| ====Stabilization==== | ====Stabilization==== | ||
| - | * Areas left inactive for more than 14 days must be stabilized | + | * Areas that do not drain to a sediment trap must be stabilized within 30 days. |
| - | * Areas at final grade must be stabilized immediately. | + | * Areas that drain to an appropriately sized [[sediment trap]] |
| + | * Areas left inactive for more than 14 days and those at final grade must be stabilized immediately. | ||
| + | |||