prescriptive_compliance
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| prescriptive_compliance [2025/04/24 14:09] – admin | prescriptive_compliance [2025/04/24 14:39] (current) – admin | ||
|---|---|---|---|
| Line 18: | Line 18: | ||
| Once areas identified as needing prescriptive compliance are identified and clearly defined in the plan, appropriate measures and specifications need to be designed, as detailed below. | Once areas identified as needing prescriptive compliance are identified and clearly defined in the plan, appropriate measures and specifications need to be designed, as detailed below. | ||
| - | ====Bare Soil==== | + | ====Practices==== |
| - | * Areas that do not drain to sediment traps must limit the duration of soil exposure to no more than 30 days. | + | * Design and implement approved stabilization practices, typically |
| - | * Areas that drain to sediment traps must limit the duration of soil exposure to no more than 90 days. | + | * Design |
| - | + | * Specify | |
| - | ====Channel & Slope Management==== | + | |
| - | * Design and implement approved stabilization practices, typically [[Erosion Matting]]. | + | |
| - | * Provide | + | |
| - | * Provide | + | |
| ====Stabilization==== | ====Stabilization==== | ||
| - | * Areas left inactive for more than 14 days must be stabilized | + | * Areas that do not drain to a sediment trap must be stabilized within 30 days. |
| - | * Areas at final grade must be stabilized immediately. | + | * Areas that drain to an appropriately sized [[sediment trap]] |
| + | * Areas left inactive for more than 14 days and those at final grade must be stabilized immediately. | ||
| + | |||
| + | ===References=== | ||
| + | *{{ : | ||
prescriptive_compliance.1745518168.txt.gz · Last modified: by admin