Line 18: Line 18:
 Once areas identified as needing prescriptive compliance are identified and clearly defined in the plan, appropriate measures and specifications need to be designed, as detailed below. Once areas identified as needing prescriptive compliance are identified and clearly defined in the plan, appropriate measures and specifications need to be designed, as detailed below.
  
-====Channel & Slope Management==== +====Practices==== 
-  * Design and implement approved stabilization practices, typically [[Erosion Matting]]. +  * Design and implement approved stabilization practices, typically [[seeding]] with [[Erosion Matting]]. 
-  * Provide stable diversion of off-site runoff around slopes. +  * Design stable diversion of off-site runoff around slopes. 
-  * Provide [[silt sock|slope interruption devices]] on slopes.+  * Specify [[silt sock|slope interruption devices]] on slopes.
  
 ====Stabilization==== ====Stabilization====
-  * Areas left inactive for more than 14 days must be stabilized immediately+  * Areas that do not drain to a sediment trap must be stabilized within 30 days
-  * Areas at final grade must be stabilized immediately.+  * Areas that drain to an appropriately sized [[sediment trap]] must be stabilized with 90 days
 +  * Areas left inactive for more than 14 days and those at final grade must be stabilized immediately. 
 + 
 +===References=== 
 +  *{{ :usle_guidance.pdf |Wisconsin DNR Construction Site Soil Loss Guidance}}