User Tools

Site Tools


recreational_trails

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
recreational_trails [2025/11/20 15:53] – created adminrecreational_trails [2025/12/02 10:35] (current) megan_duffy
Line 2: Line 2:
  
 Recreational trails provide opportunities to enjoy Dane County’s many scenic areas, however, Recreational trails provide opportunities to enjoy Dane County’s many scenic areas, however,
-their construction may impact water quality and be subject to County stormwater standards. Depending on characteristics of the trail and surrounding land area, there are stormwater treatment options that provide flexibility when planning work on a trail. The prescribed options discussed in this guidance will assist municipal or state trail designers with meeting County stormwater performance standards. This guidance applies only to new impervious area directly resulting from a trail installation – not to other impervious features such as parking lots or restrooms.+their construction may impact water quality and be subject to county stormwater standards. Depending on characteristics of the trail and surrounding land area, there are stormwater treatment options that provide flexibility when planning work on a trail. The prescribed options discussed in this guidance will assist municipal or state trail designers with meeting County stormwater performance standards. This guidance applies only to new impervious area directly resulting from a trail installation – not to other impervious features such as parking lots or restrooms.
  
 Trail projects that create 20,000 square feet or more of new impervious surface require a County stormwater management permit. Any paved or graveled surface is considered impervious. If the site (e.g., park) is already covered by a stormwater permit, any additional impervious area requires a revision to that permit. Redevelopment does not apply to recreational areas.  Trail projects that create 20,000 square feet or more of new impervious surface require a County stormwater management permit. Any paved or graveled surface is considered impervious. If the site (e.g., park) is already covered by a stormwater permit, any additional impervious area requires a revision to that permit. Redevelopment does not apply to recreational areas. 
Line 23: Line 23:
  
  
-Reference +==References== 
- +[[https://apps.dnr.wi.gov/water/wsSWIMSDocument.ashx?documentSeqNo=146200647|Design Considerations for Post-Construction Performance Standards for Public Trails near Waterways or Wetlands]]
-[[https://apps.dnr.wi.gov/water/wsSWIMSDocument.ashx?documentSeqNo=146200647|Design Considerations for Post Construction Performance Standards for Public Trails near Waterways or Wetlands]]+
  
recreational_trails.1763672032.txt.gz · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki