User Tools

Site Tools


redevelopment

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
redevelopment [2022/05/05 16:03] adminredevelopment [2022/05/19 16:33] (current) admin
Line 23: Line 23:
   *Redeveloping of existing impervious surface.   *Redeveloping of existing impervious surface.
  
-If the development is a mixture of new development and redevelopment, the redevelopment performance standards apply only to “redeveloped impervious” surfaces. New development performance standards apply to all other pervious and impervious surfaces.+If the site is a mixture of new development and redevelopment, the redevelopment performance standards apply only to “redeveloped impervious” surfaces. New development performance standards apply to all other pervious and impervious surfaces. Removing existing impervious to maximize "redeveloped impervious" surfaces is acceptable when the surfaces generate similar pollutant loads.
  
-“Redeveloped impervious” is impervious surface defined in the post-development condition, up to the area of impervious surface present in the pre-development condition. Swapping pre-developed and post-developed impervious surfaces within the site to maximize the “redeveloped impervious” is acceptable when the land uses generate similar pollutant loads.+===== Example Scenarios =====
  
-[{{ :existing.png?600 |Existing Conditions}}]+[{{ :existing.png?600 |Existing conditions as of August 21, 2001.}}]
  
-[{{ :surface_type.png?600 |Surface Type}}]+\\
  
-[{{ :proposed_1.png?600 |Scenario 1}}]+[{{ :surface_type.png?600 |Surface Type Legend}}]
  
-{{ :proposed_2.png?600 |Scenario 2}}+\\ 
 + 
 +[{{ :proposed_1.png?600 |Scenario 1: Cumulative impervious less than 20,000 ft<sup>2</sup>}}] 
 + 
 +\\ 
 + 
 +[{{ :proposed_2.png?600 |Scenario 2: Cumulative impervious greater than or equal to 20,000 ft<sup>2</sup>}}] 
 + 
 +\\ 
 + 
 +[{{ :proposed_3.png?600 |Scenario 3: Cumulative impervious greater than 20,000 ft<sup>2</sup> and replacement of existing impervious}}] 
 + 
 +\\ 
 + 
 +[{{ :proposed_4.png?600 |Scenario 4: Cumulative impervious less than 20,000 ft<sup>2</sup> through removal of existing impervious}}] 
 + 
 +\\ 
 + 
 +[{{ :proposed_5.png?600 |Scenario 5: Cumulative impervious greater than 20,000 ft<sup>2</sup> and replacement of existing impervious}}]
redevelopment.1651781035.txt.gz · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki