User Tools

Site Tools


redevelopment

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
redevelopment [2022/05/05 17:09] adminredevelopment [2022/05/19 16:33] (current) admin
Line 25: Line 25:
 If the site is a mixture of new development and redevelopment, the redevelopment performance standards apply only to “redeveloped impervious” surfaces. New development performance standards apply to all other pervious and impervious surfaces. Removing existing impervious to maximize "redeveloped impervious" surfaces is acceptable when the surfaces generate similar pollutant loads. If the site is a mixture of new development and redevelopment, the redevelopment performance standards apply only to “redeveloped impervious” surfaces. New development performance standards apply to all other pervious and impervious surfaces. Removing existing impervious to maximize "redeveloped impervious" surfaces is acceptable when the surfaces generate similar pollutant loads.
  
-{{ :existing.png?600 |Existing Conditions}}+===== Example Scenarios =====
  
-{{ :surface_type.png?600 |Surface Type}}+[{{ :existing.png?600 |Existing conditions as of August 21, 2001.}}]
  
-{{ :proposed_1.png?600 |Scenario 1}}+\\
  
-{{ :proposed_2.png?600 |Scenario 2}}+[{{ :surface_type.png?600 |Surface Type Legend}}]
  
-{{ :proposed_3.png?600 |Scenario 3}}+\\
  
-{{ :proposed_4.png?600 |Scenario 4}}+[{{ :proposed_1.png?600 |Scenario 1: Cumulative impervious less than 20,000 ft<sup>2</sup>}}]
  
-{{ :proposed_5.png?600 |Scenario 5}}+\\ 
 + 
 +[{{ :proposed_2.png?600 |Scenario 2: Cumulative impervious greater than or equal to 20,000 ft<sup>2</sup>}}] 
 + 
 +\\ 
 + 
 +[{{ :proposed_3.png?600 |Scenario 3: Cumulative impervious greater than 20,000 ft<sup>2</sup> and replacement of existing impervious}}] 
 + 
 +\\ 
 + 
 +[{{ :proposed_4.png?600 |Scenario 4: Cumulative impervious less than 20,000 ft<sup>2</sup> through removal of existing impervious}}] 
 + 
 +\\ 
 + 
 +[{{ :proposed_5.png?600 |Scenario 5: Cumulative impervious greater than 20,000 ft<sup>2</sup> and replacement of existing impervious}}]
redevelopment.1651784963.txt.gz · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki