soil_loss_and_sediment_discharge
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| soil_loss_and_sediment_discharge [2023/11/02 09:10] – admin | soil_loss_and_sediment_discharge [2026/02/11 15:03] (current) – admin | ||
|---|---|---|---|
| Line 4: | Line 4: | ||
| Permittees can demonstrate compliance with the sediment discharge standard of 5.0 tons/ | Permittees can demonstrate compliance with the sediment discharge standard of 5.0 tons/ | ||
| - | [[https:// | + | [[https:// |
| This Excel spreadsheet projects soil loss and sediment discharge from a site using the Universal Soil Loss Equation (USLE), based on the timing of land disturbance, | This Excel spreadsheet projects soil loss and sediment discharge from a site using the Universal Soil Loss Equation (USLE), based on the timing of land disturbance, | ||
| - | Note that the spreadsheet estimates soil loss from sheet and rill erosion only. It does not predict soil loss resulting from concentrated flow, slopes steeper than 33%, gully erosion or streambank erosion. If those areas exist on a site, they should be addressed through the use of prescriptive erosion control measures. | + | Note that the spreadsheet estimates soil loss from sheet and rill erosion only. It does not predict soil loss resulting from concentrated flow, slopes steeper than 33%, gully erosion or streambank erosion. If those areas exist on a site, they should be addressed through the use of [[Prescriptive Compliance]] should be used. |
| - | The WDNR has developed {{ :: | + | The Wisconsin DNR has developed {{ :: |
| Discharge Calculation Guidance}} that describes how to use the USLE spreadsheet and the [[erosion control]] page provides some additional information specific to County erosion control permitting. | Discharge Calculation Guidance}} that describes how to use the USLE spreadsheet and the [[erosion control]] page provides some additional information specific to County erosion control permitting. | ||
| Line 21: | Line 21: | ||
| ====Soil Disturbing Activities==== | ====Soil Disturbing Activities==== | ||
| - | *To meet the standard, a representative “worst case” slope/slope length should be chosen. | + | *To meet the standard, a representative “worst case” slope/slope length should be chosen |
| - | *When a slope and/or slope length is changed by grading during the bare soil period, | + | *When a slope and/or slope length is changed by grading during the bare soil period, |
| *While the WDNR guidance states that the USLE spreadsheet should not be used on slopes over 20%, County submittals should include slopes up to 33%. | *While the WDNR guidance states that the USLE spreadsheet should not be used on slopes over 20%, County submittals should include slopes up to 33%. | ||
| *In addition to the USLE calculation, | *In addition to the USLE calculation, | ||
| Line 35: | Line 35: | ||
| ===References=== | ===References=== | ||
| - | *[[file:/// | + | *{{ :usle_guidance.pdf |Wisconsin DNR Construction Site Soil Loss Guidance}} |
| - | *[[https:// | + | *[[https:// |
soil_loss_and_sediment_discharge.1698930657.txt.gz · Last modified: by admin