The cost, level of effort and expertise required to maintain stormwater practices varies, depending on the type, size and complexity of the practice. Routine maintenance, | The cost, level of effort and expertise required to maintain stormwater practices varies, depending on the type, size and complexity of the practice. Routine maintenance, | ||
+ | For practice specific flyers, see the [[Stormwater Resources]] page. | ||
=====Maintenance Agreement===== | =====Maintenance Agreement===== | ||
- | A signed and notarized {{ : | + | A signed and notarized {{: |
+ | |||
+ | {{ : | ||
====General Maintenance Requirements==== | ====General Maintenance Requirements==== | ||
Line 31: | Line 33: | ||
* Inspect twice a year to ensure proper operation and check for any potential problems, such as: sediment accumulation, | * Inspect twice a year to ensure proper operation and check for any potential problems, such as: sediment accumulation, | ||
* Removed accumulated sediment from the pond as necessary. Sediment removal will be more frequent than in a wet pond due to the smaller storage volume. | * Removed accumulated sediment from the pond as necessary. Sediment removal will be more frequent than in a wet pond due to the smaller storage volume. | ||
+ | * Repairs must restore the practice to the approved plan design. | ||
===Infiltration Basin=== | ===Infiltration Basin=== | ||
Line 52: | Line 55: | ||
* Water plants as needed during first growing season and during dry periods after first growing season. | * Water plants as needed during first growing season and during dry periods after first growing season. | ||
* Treat diseased trees and shrubs as needed. | * Treat diseased trees and shrubs as needed. | ||
- | * Do not be dump snow into device. | + | * Do not dump snow into device. |
* Once a dense vegetation layer is formed, additional mulch does not need to be added. | * Once a dense vegetation layer is formed, additional mulch does not need to be added. | ||
* Repairs must restore the practice to the approved plan design. | * Repairs must restore the practice to the approved plan design. | ||
Line 95: | Line 98: | ||
* Repairs must restore the system to the approved plan design. | * Repairs must restore the system to the approved plan design. | ||
- | ===Grassed | + | ===Vegetated |
- | * Inspect swales annually to detect and remedy nuisance conditions such as standing water or trash dumping. | + | * Inspect swales annually to detect and remedy nuisance conditions such as standing water or trash dumping. |
- | * Areas of swale showing signs of soil erosion | + | * Maintain |
- | * Areas of swale with no vegetation shall be restored to good vegetated catch. | + | * Repair areas of swale showing signs of erosion. |
- | * Limit off-street parking or other activities that may cause rutting or soil compaction in swales | + | * Limit off-street parking or other activities that may cause rutting or soil compaction in swales. |
- | * Limit the use of pesticides and fertilizer | + | * Limit the use of pesticides and fertilizer. |
- | * Maintain a height of [specify design height for vegetation] when mowing or cutting. | + | * Remove sediment when visible or if standing water exists for 24 hours after a rainfall/ |
- | * Remove sediment when infiltration rates are impeded, sediment accumulation is visible, or if standing water exists for 48 hours after a rainfall/ | + | |
* Repairs must restore the practice to the approved plan design. | * Repairs must restore the practice to the approved plan design. | ||
===Infiltration Trench=== | ===Infiltration Trench=== | ||
- | * Inspect monthly during the first year of operation, then annually. The infiltration trench is considered failed if water is present in the observation well 72 hours after the last storm event and must be restored according to the approved plan design. | + | * Inspect monthly during the first year of operation, then twice per year. The infiltration trench is considered failed if water is present in the observation well 72 hours after the last storm event and must be restored according to the approved plan design. |
* Remove accumulated material or debris on the surface of the trench and outlet regularly. | * Remove accumulated material or debris on the surface of the trench and outlet regularly. | ||
* Do not be dump snow into trench. | * Do not be dump snow into trench. | ||
- | * Measure water depth twice per year, | ||
* Repairs must restore the practice to the approved plan design. | * Repairs must restore the practice to the approved plan design. | ||
===Underground Infiltration Chamber=== | ===Underground Infiltration Chamber=== | ||
- | * Perform | + | * Inspect |
- | * Water depth in the chamber shall be measured and recorded | + | * Repairs must restore the practice |
- | * Repairs must restore the component | + | |
===Filtration Device=== | ===Filtration Device=== | ||
- | * Proprietary filtration devices shall be installed and maintained in a manner consistent with laboratory testing and modeling assumptions used to predict effectiveness. This includes | + | * Maintain [insert device name] according |
- | * The device shall be installed in accordance with manufacturer | + | * Inspect filtration |
- | * the installed device shall be equipped with an internal or external bypass to divert flows in excess of the design treatment flow rate. | + | |
- | * Filtration | + | ====Additional Forms==== |
+ | {{ :: | ||