stormwater_management
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| stormwater_management [2022/06/21 15:37] – admin | stormwater_management [2024/02/29 16:52] (current) – admin | ||
|---|---|---|---|
| Line 25: | Line 25: | ||
| {{ : | {{ : | ||
| - | The Dane County Erosion Control and Stormwater Management Ordinance sets management standards to attenuate the adverse impacts of stormwater. | + | The Dane County Erosion Control and Stormwater Management Ordinance sets management standards to attenuate the adverse impacts of stormwater. |
| {{ : | {{ : | ||
| Line 70: | Line 70: | ||
| |[[Dry Pond]]|80% TSS; 40% TSS; Rate Control|Widely applicable, Larger drainage areas needed |Low to Moderate|Provides less water quality improvement than wet pond|Sufficient/ | |[[Dry Pond]]|80% TSS; 40% TSS; Rate Control|Widely applicable, Larger drainage areas needed |Low to Moderate|Provides less water quality improvement than wet pond|Sufficient/ | ||
| |[[Gabion]]|80% TSS; 40% TSS; Stable Outlet|Widely applicable|Low to Moderate|Does not remove smaller suspended solids|Carefully size stone| | |[[Gabion]]|80% TSS; 40% TSS; Stable Outlet|Widely applicable|Low to Moderate|Does not remove smaller suspended solids|Carefully size stone| | ||
| - | |[[Grassed | + | |[[Vegetated |
| |[[Infiltration Basin]]|Infiltration; | |[[Infiltration Basin]]|Infiltration; | ||
| |[[Infiltration Trench]]|Infiltration; | |[[Infiltration Trench]]|Infiltration; | ||
| Line 89: | Line 89: | ||
| ====Runoff Rate Control==== | ====Runoff Rate Control==== | ||
| - | The ordinance requires that all stormwater facilities be designed, installed and maintained | + | The ordinance requires that all stormwater facilities be designed to maintain |
| - | *Maintain | + | |
| - | | + | **NRCS MSE4 Storm Distribution** |
| - | | + | |
| - | | + | ^Frequency |
| - | | + | |1|2.49| |
| + | |2|2.84| | ||
| + | |10|4.09| | ||
| + | |100|6.66| | ||
| + | |200|7.53| | ||
| + | |500|8.94| | ||
| The ordinance requirements for water quantity apply to individual sites and not the entire watershed. | The ordinance requirements for water quantity apply to individual sites and not the entire watershed. | ||
| Line 132: | Line 137: | ||
| The ordinance requires that discharges from new construction sites have a stable outlet capable of carrying designed flow at a non-erosive velocity. | The ordinance requires that discharges from new construction sites have a stable outlet capable of carrying designed flow at a non-erosive velocity. | ||
| - | Stable outlets are an integral part of well-designed erosion control and stormwater management practices. | + | Stable outlets are an integral part of well-designed erosion control and stormwater management practices. |
| Stable outlets must have the capacity to handle the designed outflow from the stormwater or erosion control structures they serve. | Stable outlets must have the capacity to handle the designed outflow from the stormwater or erosion control structures they serve. | ||
| Line 138: | Line 143: | ||
| ===Conveyance=== | ===Conveyance=== | ||
| - | To prevent [[grassed | + | To prevent [[vegetated |
| Culverts under private drives must be designed to convey the 10-year design storm, while those under public roadways must be designed to convey the 25-year design storm. | Culverts under private drives must be designed to convey the 10-year design storm, while those under public roadways must be designed to convey the 25-year design storm. | ||
stormwater_management.1655840248.txt.gz · Last modified: by admin