| *Redeveloping of existing impervious surface. | *Redeveloping of existing impervious surface. | ||
| - | If the development | + | If the site is a mixture of new development and redevelopment, |
| - | “Redeveloped impervious” is impervious surface defined in the post-development condition, up to the area of impervious surface present in the pre-development condition. Swapping pre-developed and post-developed impervious surfaces within the site to maximize the “redeveloped impervious” is acceptable when the land uses generate similar pollutant loads. | + | ===== Example Scenarios ===== |
| - | [{{ : | + | [{{ : |
| - | ---- | + | \\ |
| - | [{{ : | + | [{{ : |
| - | ---- | + | \\ |
| - | [{{ : | + | [{{ : |
| + | |||
| + | \\ | ||
| + | |||
| + | [{{ : | ||
| + | |||
| + | \\ | ||
| + | |||
| + | [{{ : | ||
| + | |||
| + | \\ | ||
| + | |||
| + | [{{ : | ||
| + | |||
| + | \\ | ||
| + | |||
| + | [{{ : | ||