as_built_certification
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| as_built_certification [2022/07/26 14:34] – admin | as_built_certification [2024/01/19 13:57] (current) – [As-Built Certification] josh_harder | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== As-Built Certification ====== | ====== As-Built Certification ====== | ||
| - | As‐built certification, | + | As‐built certification, |
| - | Certification | + | Certification |
| *{{ : | *{{ : | ||
| Line 9: | Line 9: | ||
| *Construction photos | *Construction photos | ||
| *Additional information as requested | *Additional information as requested | ||
| + | |||
| + | |||
| + | If the site was constructed differently than the approved plan, additional documentation must be provided showing that the site is still meeting applicable ordinance requirements and standards. | ||
| ====Record Drawings==== | ====Record Drawings==== | ||
| A record drawing is the final compiled drawing prepared by an engineer after completing a project. This drawing shows the final as-built or as-constructed condition to ensure that the project was built to the submitted and approved plans. The record drawing must include the following: | A record drawing is the final compiled drawing prepared by an engineer after completing a project. This drawing shows the final as-built or as-constructed condition to ensure that the project was built to the submitted and approved plans. The record drawing must include the following: | ||
| - | *Surveyed contours/ | + | *Surveyed contours/ |
| *Other relevant as-built information necessary to verify stormwater function, such as pipe and structure size/ | *Other relevant as-built information necessary to verify stormwater function, such as pipe and structure size/ | ||
| *Professional engineer' | *Professional engineer' | ||
| - | {{gallery>: | + | {{gallery>: |
| ====Checklists==== | ====Checklists==== | ||
| Checklists are intended to provide guidance to the design engineer and assist in expediting the review process. Additional documentation may be warranted depending upon how checklist items are addressed. | Checklists are intended to provide guidance to the design engineer and assist in expediting the review process. Additional documentation may be warranted depending upon how checklist items are addressed. | ||
| - | |||
| - | If the site was constructed differently than the approved plan, additional documentation must be provided showing that the site is still meeting all ordinance requirements and relevant standards. | ||
| *{{ : | *{{ : | ||
| Line 29: | Line 30: | ||
| ====Construction Photos==== | ====Construction Photos==== | ||
| - | Photos of all practices listed in the maintenance agreement must be included. | + | Photos of all complete |
| + | |||
| + | {{gallery>wiki: | ||
| =====Certification Process===== | =====Certification Process===== | ||
| - | The design | + | The certifying |
as_built_certification.1658860471.txt.gz · Last modified: by admin