====== As-Built Certification ====== | ====== As-Built Certification ====== | ||
- | As‐built certification, | + | As‐built certification, |
Certification must include the following: | Certification must include the following: | ||
Line 9: | Line 9: | ||
*Construction photos | *Construction photos | ||
*Additional information as requested | *Additional information as requested | ||
+ | |||
+ | |||
+ | If the site was constructed differently than the approved plan, additional documentation must be provided showing that the site is still meeting applicable ordinance requirements and standards. | ||
====Record Drawings==== | ====Record Drawings==== | ||
A record drawing is the final compiled drawing prepared by an engineer after completing a project. This drawing shows the final as-built or as-constructed condition to ensure that the project was built to the submitted and approved plans. The record drawing must include the following: | A record drawing is the final compiled drawing prepared by an engineer after completing a project. This drawing shows the final as-built or as-constructed condition to ensure that the project was built to the submitted and approved plans. The record drawing must include the following: | ||
- | *Surveyed contours/ | + | *Surveyed contours/ |
*Other relevant as-built information necessary to verify stormwater function, such as pipe and structure size/ | *Other relevant as-built information necessary to verify stormwater function, such as pipe and structure size/ | ||
*Professional engineer' | *Professional engineer' | ||
Line 21: | Line 24: | ||
====Checklists==== | ====Checklists==== | ||
Checklists are intended to provide guidance to the design engineer and assist in expediting the review process. Additional documentation may be warranted depending upon how checklist items are addressed. | Checklists are intended to provide guidance to the design engineer and assist in expediting the review process. Additional documentation may be warranted depending upon how checklist items are addressed. | ||
- | |||
- | If the site was constructed differently than the approved plan, additional documentation must be provided showing that the site is still meeting all ordinance requirements and relevant standards. | ||
*{{ : | *{{ : | ||
Line 34: | Line 35: | ||
=====Certification Process===== | =====Certification Process===== | ||
- | The design | + | The certifying |