User Tools

Site Tools


as_built_certification

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
as_built_certification [2022/10/27 14:13] adminas_built_certification [2024/01/19 13:57] (current) – [As-Built Certification] josh_harder
Line 1: Line 1:
 ====== As-Built Certification ====== ====== As-Built Certification ======
-As‐built certification, prepared by a Professional Engineer, is required within 10 days following installation of all stormwater management practices to ensure that the site was built in accordance with the approved plan.+As‐built certification, prepared by a Professional Engineer, is required within 10 days following installation of all stormwater management practices to ensure that the site was developed in accordance with the approved plan.
  
 Certification must include the following: Certification must include the following:
Line 11: Line 11:
  
  
-If the site was constructed differently than the approved plan, additional documentation must be provided showing that the site is still meeting all ordinance requirements and relevant standards.+If the site was constructed differently than the approved plan, additional documentation must be provided showing that the site is still meeting applicable ordinance requirements and standards.  Significant changes to an approved stormwater management plan require a permit revision request prior to as-built certification.  The addition, removal, alteration or relocation of best management practices is typically considered a significant change.
  
 ====Record Drawings==== ====Record Drawings====
Line 35: Line 35:
  
 =====Certification Process===== =====Certification Process=====
-The design engineer will submit the certification package electronically, and it will be reviewed by WRE staff. If additional information is needed, it will be requested by the reviewer. Once approved by the reviewer, a WRE inspector will visit the site to field verify the certification information; if any discrepancies are encountered, the inspector will ask for additional work and/or information. Once approved by the inspector and reviewer, the site will be considered in compliance with its stormwater permit and ongoing maintenance, as outlined in the deed recorded stormwater maintenance agreement, will be required.+The certifying engineer will submit the as-built package electronically, which will then be reviewed by staff for completenessA site inspection will also be performed to verify site conditions. Additional information and/or corrections may be requested to ensure the site is meeting all stormwater requirements. Once approved, the site will be considered in compliance with its stormwater management permit and regular [[stormwater maintenance|maintenance]], as outlined in the recorded maintenance agreement, will be required.
as_built_certification.1666894416.txt.gz · Last modified: by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki