as_built_certification
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
as_built_certification [2022/10/27 14:14] – admin | as_built_certification [2024/01/19 13:57] (current) – [As-Built Certification] josh_harder | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== As-Built Certification ====== | ====== As-Built Certification ====== | ||
- | As‐built certification, | + | As‐built certification, |
Certification must include the following: | Certification must include the following: | ||
Line 11: | Line 11: | ||
- | If the site was constructed differently than the approved plan, additional documentation must be provided showing that the site is still meeting applicable ordinance requirements and standards. | + | If the site was constructed differently than the approved plan, additional documentation must be provided showing that the site is still meeting applicable ordinance requirements and standards. Significant changes to an approved stormwater management plan require a permit revision request prior to as-built certification. |
====Record Drawings==== | ====Record Drawings==== | ||
Line 35: | Line 35: | ||
=====Certification Process===== | =====Certification Process===== | ||
- | The design | + | The certifying |
as_built_certification.1666894443.txt.gz · Last modified: by admin