 ====== As-Built Certification ====== ====== As-Built Certification ======
-As‐built certification, prepared by a Professional Engineer, is required within 10 days following installation of all stormwater management practices to ensure that the site was built in accordance with the approved plan.+As‐built certification, prepared by a Professional Engineer, is required within 10 days following installation of all stormwater management practices to ensure that the site was developed in accordance with the approved plan.
  
 Certification must include the following: Certification must include the following:
Line 11: Line 11:
  
  
-If the site was constructed differently than the approved plan, additional documentation must be provided showing that the site is still meeting applicable ordinance requirements and standards.+If the site was constructed differently than the approved plan, additional documentation must be provided showing that the site is still meeting applicable ordinance requirements and standards.  Significant changes to an approved stormwater management plan require a permit revision request prior to as-built certification.  The addition, removal, alteration or relocation of best management practices is typically considered a significant change.
  
 ====Record Drawings==== ====Record Drawings====