User Tools

Site Tools


as_built_certification

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
as_built_certification [2024/01/19 13:51] josh_harderas_built_certification [2024/01/19 13:57] (current) – [As-Built Certification] josh_harder
Line 11: Line 11:
  
  
-If the site was constructed differently than the approved plan, additional documentation must be provided showing that the site is still meeting applicable ordinance requirements and standards.+If the site was constructed differently than the approved plan, additional documentation must be provided showing that the site is still meeting applicable ordinance requirements and standards.  Significant changes to an approved stormwater management plan require a permit revision request prior to as-built certification.  The addition, removal, alteration or relocation of best management practices is typically considered a significant change.
  
 ====Record Drawings==== ====Record Drawings====
as_built_certification.1705690261.txt.gz · Last modified: by josh_harder

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki