This page is intended to provide guidance on infiltration design, modeling and construction, based on approved policy and frequently asked questions.
The current version of WinSLAMM (10.5.0) overestimates evapotranspiration (ET) volume. Until a fix is implemented, ET may not be turned on in the model.
Practices that rely on infiltration to properly function require extra care while being constructed and continual maintenance to prevent failure. The Infiltration Practice Construction page was created to provide guidance on how to ensure these practices are installed properly, function well and require minimal maintenance.